The work during the month of December 2002 was mostly inside, with the exception of the work in the electrical yard and on the cooling towers. Installation of air conditioning ducting and fire sprinkler pipe began in the computer section, stair construction commenced in the west end of the office section, and rebar was placed in the depressed slab area on the first floor. Another rain storm caused only a slight slowdown in work.

Click on a thumbnail for a larger image.

previous home next
Privacy & Legal Notice
Installation of underground electrical conduit in the electrical yard
Installation of underground electrical conduit in the electrical yard.

The roof of the computer section with the office section at right
The roof of the computer section with the office section at right.

The depressed slab (raised floor) are on the first floor of the office section awaits concrete
The depressed slab (raised floor) are on the first floor of the office section awaits concrete.

The stairs begin to climb the west end of the office section. B451 is at right; the west end of the computer room at left
The stairs begin to climb the west end of the office section. B451 is at right; the west end of the computer room at left.
Underground cooling water pipes for the cooling towers are installed
Underground cooling water pipes for the cooling towers are installed.
Another view of the cooling water pipe installation
Another view of the cooling water pipe installation.
The west end of the office section
The west end of the office section.
The west computer room and west end of the office section
The west computer room and west end of the office section.
The south side of the office section
The south side of the office section.
Fireproofing is blown onto steel beams in the second floor office section
Fireproofing is blown onto steel beams in the second floor office section.
The concrete slab of the raised floor of the first floor office section
The concrete slab of the raised floor of the first floor office section.
Fire sprinkler pipe (with red tape) installed in the ceiling of the west computer section
Fire sprinkler pipe (with red tape) installed in the ceiling of the west computer section.
Air conditioning ducting (silver) installed in the ceiling of the west computer section
Air conditioning ducting (silver) installed in the ceiling of the west computer section.
Fireproofing on the steel in the second floor of the office section
Fireproofing on the steel in the second floor of the office section.
The roof of the computer section with a view of Mt. Diablo
The roof of the computer section with a view of Mt. Diablo.