Construction progress on the Terascale Simulation Facility during February 2003 included pouring concrete floors, roofing the office section, installing piping in the cooling tower area, and working in the electrical yard.

Click on a thumbnail for a larger image.

previous home next
Privacy & Legal Notice
The office section, ready for installation of rebar on the ground floor
The office section, ready for installation of rebar on the ground floor.

The first part of the exterior wall on the computer section
The first part of the exterior wall on the computer section.

Steel studs to provide backing for the exterior wall of the chiller room
Steel studs to provide backing for the exterior wall of the chiller room.

Concrete is poured for the east end of the mechanical room floor
Concrete is poured for the east end of the mechanical room floor.
The section floor office section with wall framing and AC ducting and piping
The section floor office section with wall framing and AC ducting and piping.
Roofing the office section
Roofing the office section.
East end of the office section and the large conference room
East end of the office section and the large conference room.
Underground piping for the cooling towers
Underground piping for the cooling towers.
The electrical yard (foreground) and siding being installed on the chiller room
The electrical yard (foreground) and siding being installed on the chiller room.
The west end of the mechanical room with a form for electrical equipment pad (foreground) and a form for air handling unit pad
The west end of the mechanical room with a form for electrical equipment pad (foreground) and a form for air handling unit pad.
The wall being installed on the south side of the west computer room
The wall being installed on the south side of the west computer room.
Installation of siding on the south side of the west computer room (left) and support for siding on the west wall of the office sectioin (right)
Installation of siding on the south side of the west computer room (left) and support for siding on the west wall of the office section (right).