A final coat of sealer is applied to the insulation on the chilled water pipes in the chiller room
A final coat of sealer is applied to the insulation on the chilled water pipes in the chiller room.
Checkout and startup of chiller starters
Checkout and startup of chiller starters.
Wall covering is installed in the lobby
Wall covering is installed in the lobby.
Light fixtures are installed in the suspended ceiling of the office section
Light fixtures are installed in the suspended ceiling of the office section.
Installing anchor bolts in the raised floor pedestals in the east computer room
Installing anchor bolts in the raised floor pedestals in the east computer room.
Lightning rods are installed on the roof of the office section
Lightning rods are installed on the roof of the office section.
Installing controls for the chilled water system
Installing controls for the chilled water system.
Construction of the metal frame for the ceiling in the first floor elevator lobby
Construction of the metal frame for the ceiling in the first floor elevator lobby.
Installing the ceiling in the lobby area
Installing the ceiling in the lobby area.
The curved roof is installed in the large conference room
The curved roof is installed in the large conference room.
Installing a smoke dectector in the office section ceiling
Installing a smoke dectector in the office section ceiling.
Construction of a wall for the custodian closet in the east computer room
Construction of a wall for the custodian closet in the east computer room.