Construction progress on the Terascale Simulation Facility during July 2003.

 

Click on a thumbnail for a larger image.

previous home next
Privacy & Legal Notice
The first piece of a large air handler is positioned on the roof of the office section
The first piece of a large air handler is positioned on the roof of the office section.

The second piece of a large air handler is put in position
The second piece of a large air handler is put in position.

Construction on the cooling tower begins
Construction on the cooling tower begins.

The cooling tower takes shape
The cooling tower takes shape.
The 20-inch cooling tower water pipes in a trench on the west side of the chiller room
The 20-inch cooling tower water pipes in a trench on the west side of the chiller room.
The 20-inch cooling tower water pipes share their trench space with other piping
The 20-inch cooling tower water pipes share their trench space with other piping.
Additional progress on the cooling tower
Additional progress on the cooling tower.
Conduit in installed in the backfilled trench occupied by the cooling tower water pipes
Conduit in installed in the backfilled trench occupied by the cooling tower water pipes.
A concrete pad is poured for cooling tower equipment
A concrete pad is poured for cooling tower equipment.
Noticeable progress on the cooling tower construction
Noticeable progress on the cooling tower construction.
The view inside the west computer room shows its raised floor
The view inside the west computer room shows its raised floor.