Construction progress on the Terascale Simulation Facility during June 2003.

 

Click on a thumbnail for a larger image.

previous home next
Privacy & Legal Notice
The ceiling grid is installed inside the west computer room
The ceiling grid is installed inside the west computer room.

Installing the siding for the parapet on the roof of the office section
Installing the siding for the parapet on the roof of the office section.

Preparing for the installation of the large air handlers on the roof of the office section
Preparing for the installation of the large air handlers on the roof of the office section.


The south side of the office section.
The electrical yard (right) and trench work (left)
The electrical yard (right) and trench work (left).
Welding the elbows of the 20-inch cooling water pipes
Welding the elbows of the 20-inch cooling water pipes.
Installing the first large air handler on the roof of the office section
Installing the first large air handler on the roof of the office section.
The 20-inch cooling water pipes are installed in a trench next to T3520
The 20-inch cooling water pipes are installed in a trench next to T3520.