Construction progress on the Terascale Simulation Facility during March 2004.

 

Click on a thumbnail for a larger image.

previous home next
Privacy & Legal Notice
Installing duct work in the east computer room.
Installing duct work in the east computer room.
Installing ceiling in the large conference room
Installing ceiling in the large conference room.

Preparing the lobby floor for the installation of tile
Preparing the lobby floor for the installation of tile.

Installing the suspended ceiling in the east computer room
Installing the suspended ceiling in the east computer room.

Installing carpet in the 2nd floor office section
Installing carpet in the 2nd floor office section.

View of the curb for the walkway between TSF and B451
View of the curb for the walkway between TSF and B451.
Pouring concrete between B451 and TSF
Pouring concrete between B451 and TSF.

Installing the tile on the lobby floor
Installing the tile on the lobby floor.

Installing tile on the ramp into the large conference room.
Installing tile on the ramp into the large conference room.

Finishing concrete for the pathway.

Finishing concrete for the pathway.

Roof panels being installed on exterior of the large conference room.
Roof panels being installed on exterior of the large conference room.
Filling in the duct bank trench on Inner Loop road.
Filling in the duct bank trench on Inner Loop road.
Installing tile on the lobby floor.
Installing tile on the lobby floor.
View inside the east computer room.
View inside the east computer room.
Forming for the concrete walk ways.
Forming for the concrete walk ways.
Another view of the concrete work.
Another view of the concrete work.