The glass curtain wall is installed
The glass curtain wall is installed.

Silencers are installed in the return air shaft for the computer room
Silencers are installed in the return air shaft for the computer room.

The view outside from the southwest stairwell of the office section
The view outside from the southwest stairwell of the office section.

Underground electrical duct is installed
Underground electrical duct is installed.
The block wall around the electrical yard under construction
The block wall around the electrical yard under construction.
A hole is dug for an underground electrical vault
A hole is dug for an underground electrical vault.
Piping to the chillers and pumps
Piping to the chillers and pumps.
The electrical room on the first floor of the office section
The electrical room on the first floor of the office section.
Air conditioning ducts are installed on the fourth floor of the office section
Air conditioning ducts are installed on the fourth floor of the office section.
The concrete cooling tower basin with piping
The concrete cooling tower basin with piping.
Pouring the concrete footing for the block wall in the electrical yard
Pouring the concrete footing for the block wall in the electrical yard.
The west end of the office section
The west end of the office section.
Exterior panels and windows are installed on the south walls of the office section
Exterior panels and windows are installed on the south walls of the office section.
Beginning the installation of the stairs at the west end of the office section
Beginning the installation of the stairs at the west end of the office section.
Looking west at the area between the TSF (right) and B451, with installation of stairs
Looking west at the area between the TSF (right) and B451, with installation of stairs.
Fiber optic cable installation begins on the second floor of the office section
Fiber optic cable installation begins on the second floor of the office section.
Electrical cables being pulled in the electrical yard
Electrical cables being pulled in the electrical yard.