November 2002 brought the first rain of the season. With the completion of the steel frame, construction on the Terascale Simulation Facility (TSF) moved indoors for the pouring of concrete floors in the office section. Back outside, construction progress included roofing of the computer section and installation of electrical equipment in the mechanical room and electrical yard.

Click on a thumbnail for a larger image.

previous home next
Privacy & Legal Notice
The view of the office section and the work site following the season's first rain storm
The view of the office section and the work site following the season's first rain storm.

Excavation of cooling tower area
Excavation of cooling tower area.

Installation of electrical conduit in chiller room
Installation of electrical conduit in chiller room.

Depressed slab (raised floor) area on the second floor of the office section
Depressed slab (raised floor) area on the second floor of the office section.
Roofing is installed on the computer section
Roofing is installed on the computer section.
Decking on the third floor of the office section. The roof of the computer section is to the right
Decking on the third floor of the office section. The roof of the computer section is to the right.
Concrete is poured on the second floor of the office section
Concrete is poured on the second floor of the office section.
Wire mesh is installed on the second floor of the office section
Wire mesh is installed on the second floor of the office section.

Installation of the roof on the computer section; roof drains are visible at right.
Drain pipe is installed in the first floor of the office section
Drain pipe is installed in the first floor of the office section.
Concrete is poured on the sloped part of the computer section roof. The sloped concrete provides structural strength
Concrete is poured on the sloped part of the computer section roof. The sloped concrete provides structural strength.
Underground boxes and conduit are installed in the electrical yard
Underground boxes and conduit are installed in the electrical yard.
Installation of pipe for the cooling towers
Installation of pipe for the cooling towers.
Roofing continues on the computer section
Roofing continues on the computer section.
Finishing the concrete on the third floor of the office section
Finishing the concrete on the third floor of the office section.
A view of the east office section
A view of the east office section.
A view of the west office section
A view of the west office section.

The electrical yard (located west of the computer section).