Terascale Simulation Facility logo

Construction progress on the Terascale Simulation Facility during November 2003.

 

Click on a thumbnail for a larger image.

previous home next
Privacy & Legal Notice
Positioning the first half of LGS-45, part of the electrical yard
Positioning the first half of LGS-45, part of the electrical yard.
Positioning the second half of LGS-45, part of the electrical yard
Positioning the second half of LGS-45, part of the electrical yard.
Work on the electrical duct bank on Inner Loop Road
Work on the electrical duct bank on Inner Loop Road.
A large underground high voltage electrical vault is installed
A large underground high voltage electrical vault is installed.

Power to part of the building is turned on in the electrical yard
Power to part of the building is turned on in the electrical yard.

Chilled water piping for one of the chillers is installed
Chilled water piping for one of the chillers is installed.
The frame for the projection screen in the large conference room
The frame for the projection screen in the large conference room.

The front of the office section with the large conference room sheathed in a black waterproof membrane
The front of the office section with the large conference room sheathed in a black waterproof membrane.

The cooling tower
The cooling tower.
Pumps and piping for the cooling tower
Pumps and piping for the cooling tower.
The fan and motor inside one of the large computer room air handlers
The fan and motor inside one of the large computer room air handlers.