Grading in front of the main lobby entrance preparatory to landscaping
Grading in front of the main lobby entrance preparatory to landscaping.
Chilled water pumps and piping
Chilled water pumps and piping.
The computer room
The computer room.
Sheet rock is installed in the offices
Sheet rock is installed in the offices.

Piping and pumps are installed on the cooling towers
Piping and pumps are installed on the cooling towers.

Work on the electrical duct bank for LGS-45
Work on the electrical duct bank for LGS-45.
The loading dock area
The loading dock area.

The west end of the office section
The west end of the office section.

The front entrance and lobby
The front entrance and lobby.
Preparing to lay asphalt for the roadway on the west side of the electrical yard
Preparing to lay asphalt for the roadway on the west side of the electrical yard.
North side of the computer section
North side of the computer section.

Paving the loading dock and truck turnaround area
Paving the loading dock and truck turnaround area.

An electrician installs wiring in the large breaker panel in the mechanical room
An electrician installs wiring in the large breaker panel in the mechanical room.
Installing the suspended ceiling in the ASL computer room
Installing the suspended ceiling in the ASL computer room.
The wood backing for the roofing system of the large conference room is installed
The wood backing for the roofing system of the large conference room is installed.
A large trench is dug for the high voltage underground duct bank west of B451
A large trench is dug for the high voltage underground duct bank west of B451.